railway projects

Koraput-Singapur Road Doubling Project:- Supplying, transporting and stacking of 97,000 cum of contractor’s hard stone machine crushed Track Ballast as per Railway specifications between Lakshmipur Road – Tikiri stations (including yard) from 61.17 Km to 83.06 Km on KR line of WAT Division of East Coast Railway.
- LOA Date/Commencment: 26.12.18
- Place of Execution: Koraput

Package- A1 – “Construction of roadbed and Minor Bridge, ETC works in connection with Doubling between Mau (MAU) (Excluding) 0.00 Km and Azamgarh (AMH) (Including) Km 43.50 (Total 43.50 Km) in Varanasi Division of North Eastern Railway, Uttar Pradesh, India”.
- LOA Date/Commencment: 09.10.19
- Place of Execution: VANARAS


- LOA Date/Commencment: 09.10.19
- Place of Execution: VANARAS

Package – 5A -“Construction of Roadbed, Minor Bridges, Service Buildings including amenities, Passenger amenities at stations and related works along with General Electrical works in connection with 3rd Line between Rayagada (Excl) (KM 343.90) – Jimidipeta (Excl) (KM 356.518) on Waltair Division of East Coast Railway in Odisha State, India.
- LOA Date/Commencment: 15.10.19
- Place of Execution: RAYAGADA


- LOA Date/Commencment: 25.11.19
- Place of Execution: RAIPUR

- LOA Date/Commencment: 25.02.20
- Place of Execution: KEONJHAR


- LOA Date/Commencment: 31.08.20
- Place of Execution: Visakhapatnam

- LOA Date/Commencment: 01.04.21
- Place of Execution: KEONJHAR


- LOA Date/Commencment: 04.08.21
- Place of Execution: KORAPUT

- LOA Date/Commencment: 28.12.21
- Place of Execution: KEONJHAR


- LOA Date/Commencment: 07.03.2022
- Place of Execution: Chhattisgarh

- LOA Date/Commencment: 04.04.22
- Place of Execution: KHURDA BOLANGIR


- LOA Date/Commencment: 28.01.2023
- Place of Execution: Lucknow

- LOA Date/Commencment: 15.09.2023
- Place of Execution: TALCHER


- LOA Date/Commencment: 13/08/2024
- Place of Execution: JALESWAR TO BHADRAL

- LOA Date/Commencment: 28/08/2024
- Place of Execution: Jaleswar (EX) to Rajghat


- Place of Execution: ASONSOL , KOLKATTATO BHADRAL

- LOA Date/Commencment: 26/11/2024
- Place of Execution: TALCER BIMLAGARH


- LOA Date/Commencment: 04/12/2024
- Place of Execution: DASPALLA