My Blog

major 9 Projects

A long straight road stretches through fields under a dramatic cloudy sky.
01
Koraput-Singapur Road Doubling Project: Execution of Earth-work in formation, Major bridges’ works, Minor bridges’ works, P.Way related works, Supply of Ballast, Station & Service buildings works, Platforms’ works, Foot Over Bridges’ works and other allied works from Km 33.50 to Km 61.17 in Baiguda- Lakshmipur Road section in connection with doubling of existing single line track in Koraput-Singapur Road line of Waltair Division of East Coast Railway.
rail, railroad, countryside
02

Execution of work of roadbed, minor bridges, major bridges, supply of ballast and track linking excluding supply of rails and sleepers, thick web switches and special sleepers between chainage km 79.6- km 93 of taroki -rowghat section and track linking.

rail, railroad, countryside
03
Execution of Roadbed (earthwork in Cutting & Banking), Laying of Blanket, Minor Bridges, RUB/LHs, Building works, supply of vehicle, site facilities & General Power Supply including power line diversion works and other allied works between km.143 to 172 (29 Route km+12.108 Long chainage=41.1km) and supply of track ballast, track linking works including unforeseen/allied items between km 194 to 143 (51 Route km+LC 12.108km=63km(Apx) of Khurda Road-Bolangir new BG Rail Link project of E.Co.Railway.
rail, railroad, countryside
04

Provision of 3rd and 4th line between Barabanki (Excluding)-Malhaur (Excluding) Stations (2X13.50 Km) including Electrification & Signalling works on Lucknow Division of Northern Railway.

rail, railroad, countryside
A long straight road stretches through fields under a dramatic cloudy sky.
05
Widening and Strengthening to 2L+PS of Kandarpur – Balikuda from Km 277.500 to Km 318.970 of NH-55 in the State of Odisha on EPC mode”(Bid Ref No.-13 CE NH of 2022-23)
rail, railroad, countryside
06
Widening and strengthening to 4L PS 2 LPS from km 0.000 to 35.800 Kuakhia – Mangalpur Section of NH-20 in the State of Odisha on EPC mode.
rail, railroad, countryside
07
Composite works (Civil & Electrical) involving Earthwork, Blanketing, P.Way work, Minor& Major Bridge work, ROBs/LHS, Retaining wall, Shifting of Utilities, Station buildings, Quarters, Drain, Road diversion, Supply and spreading of ballast, supply of P.Way materials, Linking of track and other P.way work and other ancillary associated Civil Engineering works and Supply, Installation, Testing and commissioning in connection to electrification with 2X25 KV OHE system and Electrical General work and Removal/Modification of various electrical infringements 11 KV/33 KV H.T. & L.T. overhead lines coming under proposed alignment between Pradhankhanta (DFCC/IR CH:261.200/260.200) to Gomoh (DFCC/IR CH: 28.470/300.15) Approx. 39.00 KM Route, KM including New Pradhankhunta yard and Excluding 1.4 KM (DFCC/IR CH: 271.090/270.090 to DFCC/IR Ch: 272.490/271.490) in connection with construction of 3rd & 4th Double line track in Dhanbad Division of East Central Railway under Dy/CE/Con/Dhanbad.
rail, railroad, countryside
08
Rehabilitation and Up gradation from 4 to 8 laning of Chandikhole – Paradip Section of NH-53 (Old NH – 5A) from Km.60.000 to Km.76.646 (Package-4) in the State of Odisha on HAM mode – 2nd Call
rail, railroad, countryside
09
Execution of balance work of earthwork in formation in embankment/cutting, extension of 2 nos. minor bridge, construction of goomty, PF, PF shelter, FOB, permanent way linking and allied works in Dantan Yard (Phase-2) to Jaleswar (Ex) in connection with the construction of 3rd line between Narayangarh-Bhadrak of S. E. Railway.
"Lorem lacus reiciendis illo placerat tempus, temporibus deserunt commodo incidunt error, unde. Facilisis aspernatur. Recusandae illum"
Matthew Fox
CEO At Sky Tail Ltd.
Commercial Properties

Sky Tail Tower

You can use these sections to highlight the features of heading. Use these paragraphs to focus on the topic you want. Make sure you keep it short and attractive.

Scroll to Top