road Projects
01
Koraput – Singapur Road Doubling Project: Construction of Major Bridge No. 1 (1×18.3m Composite Girder, RUB), Br.No3 (5×30.5m composite Girder), Br.No.6 (5×30.5 Composite Girder), Br. No.12 (1×12.2m +1×30.5m+ 1×12.2m Composite Girder), Br. No.19 (1×12.2m +1×30.5m+1×12.2m Composite Girder), Br. No. 21A (1×36.0m Composite Girder, ROB), Br.NO.25(2×9.15m RCC Box) &, Br.NO.26(3×6.1m RCC Box) between Koraput -Damanjodi stations in connection with Doubling of Koraput – Singapur Road section of WAT Division, East Coast Railway.
- Value of Work (in lakhs): 7,157.46
- LOA Date/Commencment: 04.07.17
- Place of Execution: KORAPUT
02
Widening the existing lane to 2 lane with paved shoulder from Km.239/900 to 294/300 km (Nayagarh to Khurda) excluding Khurda bypass of NH-57 on EPC mode in the state of Odisha
- Value of Work (in lakhs): 12,479
- LOA Date/Commencment: 27.03.18
- Place of Execution: NAYAGARH
03
Strengthening to NH-326(A) from km (70/000 -102/900) in the state of Odisha for the year 2019-20
- Value of Work (in lakhs): 2,094.00
- LOA Date/Commencment: 18.05.20
- Place of Execution: Parlakhemundi
04
Strengthening to NH 326 from km 311.700 to 327.700 (Design Length 18.255 km instead of 16 km) (Jeypore to Mahuli) for the year 2019-20 on EPC Basis in the State of Odisha. (Bid Ref No.- 10 CE NH of 2019-20)
- Value of Work (in lakhs): 843.53
- LOA Date/Commencment: 29.05.20
- Place of Execution: Jeypore
05
SECOND EXIT ROAD CUM FLYOVER AT PARADIP AS PART OF ADDITIONAL PORT CONNECTIVITY FROM NATIONAL HIGHWAY: IPRCL
- Value of Work (in lakhs): 8,393.48
- LOA Date/Commencment: 25.08.20
- Place of Execution: Paradip
06
Rehabilitation and upgradation to 2-lane with Paved shoulder of NH- 510 (Singtam – Tarku – Rabongla – Legship -Gyalshing)Package-IV (Design chainage from km 33+600 to km 58+840) in the state of Sikkim in EPC Mode
- Value of Work (in lakhs): 14,490.00
- LOA Date/Commencment: 31.08.20
- Place of Execution: Sikkim
07
Widening and strengthening to two lane with paved shoulders from km 296.500 to km 336.500 (Mundamarai to Ratanpur Section) of NH-59 in the state of odisha on EPC mode.
- Value of Work (in lakhs): 6,942.00
- LOA Date/Commencment: 05.11.20
- Place of Execution: Ganjam
08
4 Laning of Itanagar to Banderdewa section of NH 415 from km 40/430 to km 51/735 Package B on EPC Mode in the State of Arunachal Pradesh
- Value of Work (in lakhs): 34,172.00
- LOA Date/Commencment: 26.11.20
- Place of Execution: Arunachal Pradesh
09
Completion of Balance work of Panikoili- Rimuli Section of NH-215 (New NH-20) from Km.0.000 to Km.163.000 (Design Chainage Km.0.000 to Km.166.173) in the State of Odisha on Single Percentage Item Rate Contract.
- Value of Work (in lakhs): 14,642.75
- LOA Date/Commencment: 08.01.21
- Place of Execution: Panikoili
10
Widening TO 2 lane with geometric improvements of Tura Dalu road from Km 85.000 to 95.000 & 101.000 to 145.000 to 2 lanes with paved shoulder of Tura-Dalu section of NH-51 in the state of Meghalaya with Japan International Cooperation Agency (JICA) loan assistance
- Value of Work (in lakhs): 22,000.00
- LOA Date/Commencment: 19.09.2021
- Place of Execution: MEGHALAYA
11
P/R to NH-326 from Km 192/450 to 192/797,194/000 to 198/000,199/150 to 202/150 & 202/790 to 212/700 in the state of Odisha on EPC mode (Bid Ref No.- 08 CE NH of 2021-22)
- Value of Work (in lakhs): 678.00
- LOA Date/Commencment: 07.10.21
- Place of Execution: KORAPUT
12
Improvement to Mashiripada – Kelapada – Sadingia Balandapada road from 0.0 to 15.000km in the District of Kandhamal under NABARD Assistance
- Value of Work (in lakhs): 2,592.00
- LOA Date/Commencment: 30.06.22
- Place of Execution: KANDHAMAL
13
Rehabilitation and upgradation of 4-Laning of Rajamunda-Barkote section of NH 23 (New Nh-143) from Km 287.200 to Km 337.185 in the state of Odisha Under NHDP-IV on EPC Mode” (49.985 Km): GAYATRI/SHIVAM: ORG AGT: 394.00 CR/SUBLET: 191.48 CR
- Value of Work (in lakhs): 35,000.00
- LOA Date/Commencment: 26.09.2022
- Place of Execution: Rajamunda Barkote: Rourkela, Sundargarh
14
Construction of HL Major Bridge across river Baitarani at Km 105.080 and Rehabilitation of Bridge across river Deo at Km 90.850 of NH-220 in the state of Odisha on EPC mode. (Bid Ref No.-07 CE NH of 2022-23)
- Value of Work (in lakhs): 3,677.10
- Place of Execution: Keonjhar, Odisha
15
Reconstruction of HL major bridge across River Tel near Sonepur at Km 51.200 (Design Chainage 51.140 km) of NH-57 in the State of Odisha on EPC mode (Bid Ref No.-09 CE NH of 2022-23)
- Value of Work (in lakhs): 5,188.00
- LOA Date/Commencment: 3105 DT 29.09.2022
- Place of Execution: Sambalpur, Odisha
16
Renovation and restoration work of direct off-taking minors of RMC km. 57.50 to 103.5 of RMC CAD Kota. JAIPUR: SHIVAM
- Value of Work (in lakhs): 4,173.14
- LOA Date/Commencment: LOA: 2048 DT 28.10.2022
- Place of Execution: Jaipur, Rajastan, India
17
Construction and widening of Concrete Road, Retaining Walls etc. in Harbour area.: PARADIP PORT AUTHORITY. (2022-23)
- Value of Work (in lakhs): 4,354.22
- LOA Date/Commencment: LOA NO: 496 DT 07.11.2022
- Place of Execution: Paradip, Odisha
18
Construction of Underpass at Km.06+853 along with approaches from Km.06+205 to Km.07+495 on Panikoili-Rimuli Section of NH 215 (New-NH-20) in the state of Odisha on Engineering Procurement and Construction (EPC) Mode. (Agt. Rs 15,33,62,356/- + GST)
- Value of Work (in lakhs): 1,533.62
- LOA Date/Commencment: LOA NO: 2699/2022 DT 15.11.2022
- Place of Execution: Panikoili, Odisha
19
Urgent rapair maintenance /strengthening of existing 2 lane road from Ch.234+280 to Ch 235+600 at Roxy (De-scoped-Length) in the stretch Koida to Rajamunda Section of NH – 215 (New-520) in the state of Odisha: KIPPL: Agt Value: Rs 2,19,57,642/-+ GST
- Value of Work (in lakhs): 259.10
- LOA Date/Commencment: LOA NO: 3930/2022 DT 29.11.2022
- Place of Execution: KOIDA RAJAMUNDA
20
Widening & Strengthening of Budhambo – Buguda Road from 0/000 to 26/000 Km in the district of Ganjam under CRIF: SHIVAM, AGT: 36,86,22,565/
- Value of Work (in lakhs): 3,686.23
- LOA Date/Commencment: 13310 DT 02.12.2022
- Place of Execution: EE Bhanjanagar, Ganjam Odisha
21
Improvement and Widening of Chandapur- Raj-Sunakhala Road from 0/0 Km to 15/00 km in the district of Nayagarh under CRIF. Agt: 18,56,00,625/- + GST SHIVAM.
- Value of Work (in lakhs): 2,190.09
- LOA Date/Commencment: LOA: 7993 DATED 23.12.202
- Place of Execution: NAYAGARH
22
Execution of Major bridge of Span 1×12.2 m Plate Girder, Minor Bridges, Earthwork in formation and other miscellaneous work like Drain, Protection works etc in connection with doubling of Lingaraj SILO connectivity of NTPC line of MCL.
- Value of Work (in lakhs): 3,507.85
- LOA Date/Commencment: 04.01.2023
- Place of Execution: MCL
23
Improvement of road to 4-lane standard carriageway from Naka Gate to Kateni from 3/500 km to 8/640 km in the district of Khordha under CRDP.
- Value of Work (in lakhs): 2,486.99
- LOA Date/Commencment: 07.01.2023
- Place of Execution: BHUBANESWAR
24
Construction of Bypass to Nayagarh town from km 235.469 to km 252.482 of NH-57 in the State of Odisha on EPC mode.”
- Value of Work (in lakhs): 7,100.00
- LOA Date/Commencment: 19.01.2023
- Place of Execution: NAYAGARH
25
Construction of Railway over Bridge at Km 60.200 of NH316 Km 3.2 of Old NH203E at Matiapada on Puri Konark Road, KP42 of Khurdha Puri Rail Line in the state of Odisha under EPC Mode
- Value of Work (in lakhs): 5,000.00
- LOA Date/Commencment: 12.01.2023
- Place of Execution: PURI
26
Improvement such as widening and strengthening of Nayagarh- Jagannathprasad-Bhanjanagar road (SH-21) from 38/000 km to 82/000 km in the district of Ganjam under State Plan. SHIVAM. RS 38,29,06,095+GST
- Value of Work (in lakhs): 4,518.29
- LOA Date/Commencment: 02.02.2023
- Place of Execution: Bhanjanagar
27
Urgent repair maintenance of 4-laning of Rajamunda – Barkote section of NH-23 (New NH-143) (Km 287.200 to Km 337.185) under NHDP-IV on EPC Basis in the State of Odisha (3rd Call) . KIPPL; Rs 2,96,34,688/-+ GST EXTRA
- Value of Work (in lakhs): 349.69
- LOA Date/Commencment: 02.02.2023
- Place of Execution: BARKOTE
28
Construction of Road Over Bridge (ROB) No.24 of Span 1×24.0m Composite Girder to eliminated existing Level Crossing No.7 (near approach to SPUR 1 & 2) at Talcher Coalfield of MCL. SHIVAM
- Value of Work (in lakhs): 1,736.17
- LOA Date/Commencment: 20.02.2023
- Place of Execution: TALCHER
29
Construction of Road Over Bridge (ROB) No.30A of Span 1×36.0m Composite Girder to cater traffic from Bhubaneswari Mines to Spur 1& 2 and movement of public from Dera chowk to Central Colony area at Talcher Coalfield of MCL. SHIVAM
- Value of Work (in lakhs): 2,440.44
- LOA Date/Commencment: 20.02.2023
- Place of Execution: TALCHER
30
Construction of Road Over Bridge (ROB) No.2 of Span 1×36.0m Composite Girder to cater traffic from Bhubaneswari Mines to ROB No.30-B & ROB No.30-A, SPUR-4 and movement of public from Dera chowk to Central Colony via ROB No.30A at Talcher Coalfield of MCL. GVR SHIVAM
- Value of Work (in lakhs): 3,674.34
- LOA Date/Commencment: 20.02.2023
- Place of Execution: TALCHER
31
Construction of H.L. Bridges with 4-lane approach road to 650 bedded Teaching Hospital for SLN Medical College and Hospital, Koraput under state plan. SHIVAM; Agt: Rs 22,22,03,930/-
- Value of Work (in lakhs): 2,622.01
- LOA Date/Commencment: 22.02.2023
- Place of Execution: KORAPUT
32
Construction of Road Over Bridge (ROB) No.30B of Span 1×18.0m Composite Girder to cater traffic from Bhubaneswari Mines to SPUR 3 at Talcher Coalfield of MCL. SHIVAM |
- Value of Work (in lakhs): 1,049.44
- LOA Date/Commencment: 04.03.2023
- Place of Execution: TALCHER
33
Construction Bypass to Bhawanipatna town from km 171.805 to km 184.190 of NH26 in the state of Odisha on EPC mode. SHIVAM
- Value of Work (in lakhs): 8,600.00
- LOA Date/Commencment: 03.03.2023
- Place of Execution: BHAWANIPATNA
34
Widening & Strengthening of Sankarakhole – Khajuripada Road from 0/00 to 21/310 Km in the district of Kandhamal under CRIF. SHIVAM: AGT VALUE: RS. 26,27,70,157/-
- Value of Work (in lakhs): 3,100.69
- LOA Date/Commencment: 13.03.2023
- Place of Execution: SANKARAKHOL
35
Improvement and widening of Old P.K. road to HaripurChhak via Patapur Bamnal, Barimunda, Bandhamunda, Kolhana, Chakarkuda, Sandhagorada, Areisahi Balanga College Chhaka Balanga, Sambhu Bharatipatna, Dakhinaradas, BaliaHaripur in the district of Puri under StatePlan. Agt value: Rs 20,22,51,194/-+GST: SHIVAM
- Value of Work (in lakhs): 2,386.56
- LOA Date/Commencment: 2199 DT 09.03.2023
- Place of Execution: PURI
36
Widening and Strengthening to two lane pavd shoulder from Km 277.500 to Km 318.970 (Kandarpur – Balikuda) of NH-55 in the State of Odisha on EPC mode.
- Value of Work (in lakhs): 21,400.00
- LOA Date/Commencment: 2888 DT 16.03.2023
- Place of Execution: KANDARPUR
37
Construction of 4 lane Greenfield Highway from Chatrapur on NH 16 to Gopalpur port (Km 0.000 to km 4.500)and upgradation to 6lane elevated configuration of existing NH16 (Km 429.025 to km 430.990)under Bharatmala Pariyojana in Odisha State on EPC Mode.NHAI : SHIVAM: Rs118,00,00,000/-(GST EXTRA)
- Value of Work (in lakhs): 13,924.00
- LOA Date/Commencment: 2022 DT 31.03.2023
- Place of Execution: BERHAMPUR
38
Construction of 4 lane Road Over Bridge (ROB) along with its approaches service road at Civil Lines Level Crossing, JDA, Jaipur. SHIVAM
- Value of Work (in lakhs): 4,006.57
- LOA Date/Commencment: 01 DT 20.04.2023
- Place of Execution: JAIPUR
39
Construction of Drains for Strengthening of Drainage System on Jagatpura area Zone 9, JDA Jaipur (Part-I Main Drainage Line).SHIVAM
- Value of Work (in lakhs): 1,937.83
- LOA Date/Commencment: 09 DT 23.05.2023
- Place of Execution: JAIPUR
40
Construction of Drains for Strengthening of Drainage System on Jagatpura area Zone 9, JDA Jaipur (Part-II Connecting Drains) SHIVAM
- Value of Work (in lakhs): 1,932.65
- LOA Date/Commencment: 10 DT 23.05.2023
- Place of Execution: JAIPUR
41
Widening and strengthening to 4L + PS/ 2L + PS from km 0.000 to 35.800 Kuakhia – Mangalpur Section of NH-20 in the State of Odisha on EPC mode.
- Value of Work (in lakhs): 23,800.00
- LOA Date/Commencment: 30.06.2023
- Place of Execution: JAIPUR
42
Manufacturing & Supplying of 200000 cum 50 mm size machine crushed stone ballast at Amoni station yard /depot and Loading of stone ballast to any type of Railway wagon i.e. hoppers / BCNs etc. for construction of project of N. F. Railway.
- Value of Work (in lakhs): 4,079.52
- LOA Date/Commencment: 30.08.2023
- Place of Execution: Assam
43
Composite works (Civil & Electrical) involving Earthwork, Blanketing, P.Way work, Minor& Major Bridge work, ROBs/LHS, Retaining wall, Shifting of Utilities, Station buildings, Quarters, Drain, Road diversion, Supply and spreading of ballast, supply of P.Way materials, Linking of track and other P.way work and other ancillary associated Civil Engineering works and Supply, Installation, Testing and commissioning in connection to electrification with 2X25 KV OHE system and Electrical General work and Removal/Modification of various electrical infringements 11 KV/33 KV H.T. & L.T. overhead lines coming under proposed alignment between Pradhankhanta (DFCC/IR CH:261.200/260.200) to Gomoh (DFCC/IR CH: 28.470/300.15) Approx. 39.00 KM Route, KM including New Pradhankhunta yard and Excluding 1.4 KM (DFCC/IR CH: 271.090/270.090 to DFCC/IR Ch: 272.490/271.490) in connection with construction of 3rd & 4th Double line track in Dhanbad Division of East Central Railway under Dy/CE/Con/Dhanbad.
- Value of Work (in lakhs): 61,873.48
- LOA Date/Commencment: 16.04.2024
- Place of Execution: Gomoh, Dhanbad
44
Construction of New Minor Bridge across Jeriguda Nallah at Km 297.520 (Design Chainage) of NH-326 including approaches in the state of Odisha on EPC Mode. NIRAJ CEMENT STRUCTURAL LIMITED.
- Value of Work (in lakhs): 820.00
- LOA Date/Commencment: 685 DT 22.02.2024
- Place of Execution: SUNABEDA
45
Rehabilitation and Up gradation from 4 to 8 laning of Chandikhole – Paradip Section of NH-53 (Old NH – 5A) from Km.60.000 to Km.76.646 in the State of Odisha on EPC mode. RVNL: SHIVAM: Rs. 661,11,00,000/-+ GST
- Value of Work (in lakhs): 66,111.00
- LOA Date/Commencment: 02.08.2024
- Place of Execution: Chandikhole – Paradip
46
Construction of Railway Embankment, Roadbed, Major & Minor Bridges, RUBs, ROBs, Track Linking (Excluding Supply of Rails), Stations and other Service buildings including electrical, sanitation and water supply works, FOB and other ancillary works in connection with Construction of Proposed Itapara Railway Siding under Salanpur Area of ECL taking off from Chinchuria Railway station under Asansol Division of Eastern Railway in Paschim Bardhhaman district, West Bengal. (IPRCL) SHIVAM: RS.129,45,71,375.08 + GST
- Value of Work (in lakhs): 12,945.71
- LOA Date/Commencment: 30.08.2024
- Place of Execution: ASONSOL , KOLKATTA
47
Improvement to Communication Facility along Left Side Embankment of river Baitarani from RD 24.500 Km to RD 72.500 Km (from Ballavighat to Tintraghat) including strengthening of Vulnerable Reaches”. OCC: SHIVAM: RS 38,25,66,931+/- +GST
- Value of Work (in lakhs): 4,514.29
- LOA Date/Commencment: 18.09.2024
- Place of Execution: JAJPUR