Road Projects
01
Improvement to Ranpur – Siko – Jankia road from 0.0 to 20.200km in the district of Khurda/Nayagarh under NABARD Assistance.
- Value of Work (in lakhs): 1,403.92
- LOA Date/Commencment: 24.06.2014
- Place of Execution: RANPUR
02
Improvement to Balakati – Balianta road from 0.0 to 12.000km in the district of Khurda under NABARD Assistance.
- Value of Work (in lakhs): 1,570.58
- LOA Date/Commencment: 1,570.58
- Place of Execution: BALAKATI
03
S.R. to N.H. 316(Satapada Link) from Km0/00 to Km 18/500 for Nabakalebara 2015
- Value of Work (in lakhs): 713.67
- LOA Date/Commencment: 23.12.2014
- Place of Execution: SATAPADA
04
Sidheswar-Goutami : Improvement to Sidheswar-Goutami road from 0.000km to 10.500Km in the district of Ganjam under NABARD Assistance for the year 2014-15.
- Value of Work (in lakhs): 1,252.44
- LOA Date/Commencment: 07.09.2015
- Place of Execution: GANJAM
05
PR in km260.28-264.28,361.48-365.48,376.48- 378.48,390.48-393.48 ,426.48-434.767 of NH-26 in the state of Odisha.
- Value of Work (in lakhs): 646.22
- LOA Date/Commencment: 28.04.2015
- Place of Execution: SUNABEDA
06
Widening & Strengthening of Kandarpur – Machhagaon road (SH -43) from 14/000km. to 25/000km. Under SHDP
- Value of Work (in lakhs): 1,890.25
- LOA Date/Commencment: 15.04.2015
- Place of Execution: KANDARPUR
07
Periodical renewal (PR) for km 40/255 to 41/055 of NH -63 & km 319/280 to 328/480 of NH-26 (erstwhile NH 217 from km 357/0 to 367/0 km of NH-43 ) in the state of odisha for the year 2013-14
- Value of Work (in lakhs): 446.29
- LOA Date/Commencment: 01.05.2014
- Place of Execution: SUNABEDA
08
Improvement to Sri Sri Baladevjew Rathadanda, Kendrapara (Such as widening and strengthening from 0/188Km to 1/0Km).
- Value of Work (in lakhs): 668.85
- LOA Date/Commencment: 03.12.2015
- Place of Execution: KENDRAPADA
09
Widending and strengthening of Hirakud-Remed road with paved shoulder from 0/000 km to 6/200 Km under state plan.
- Value of Work (in lakhs): 695.69
- LOA Date/Commencment: 02.05.2016
- Place of Execution: SAMBALPUR
10
Widening of existing 2lane to 4lane including geometrics correction near curves and providing other road safety measures from Km.322/700 to 325/000 of NH-59 for the year 2014-2015.
- Value of Work (in lakhs): 874.72
- LOA Date/Commencment: 20.06.2015
- Place of Execution: BERHAMPUR
11
Widening the exiting 2 lane to 2 lane with paved shoulder from 181.00 to 239.280 Km (Bhawanipatna to Kokasara) of NH-26 in the state of odisha on EPC Basis.
- Value of Work (in lakhs): 10200.00
- LOA Date/Commencment: 20.09.2016
- Place of Execution: Bhawanipatna
12
Protection on Khad side of Kalinga Ghat from Km 83/00 to 93/00 of NH 157.
- Value of Work (in lakhs): 1155.00
- LOA Date/Commencment: 17.10.2016
- Place of Execution: Phulbani
13
Widening & Strengthening Of Existing Carriageway To Two Lane For Chandbali-Bhadrak-Anandpur Road (Km 0/00 To Km 45/00 Of Sh-9 And Km 0/0 To Km 43/00 Of Sh-53): PO2.Package No OSRP-Bal-P02.
- Value of Work (in lakhs): 5854.00
- LOA Date/Commencment: 15.12.2016
- Place of Execution: Bhadrak
14
Widening and strengthening of existing single lane carriageway to double lane from 4/8 to 6/8 Km , 11/5 to 16/250 Km. 20/450 to 27/0km of Ramgiri-jeerango-Narayanpur road (SH-22) Under SHDP
- Value of Work (in lakhs): 2273.00
- LOA Date/Commencment: 27.02.2017
- Place of Execution: Parlakhemundi
15
Supply of Ballast in connection with 3rd & 4th line work between Salegaon to Rajathgarh in KUR Division.
- Value of Work (in lakhs): 1787.52
- LOA Date/Commencment: 04.05.17
- Place of Execution: Rajathagarh
16
Widening & strengthening of Gada Palasuni – Petraghati – Bimala-Sirigida-Khuntipada- Telkoi road from 0/00 Km to 10/00 Km under CRF.
- Value of Work (in lakhs): 725.20
- LOA Date/Commencment: 09.10.17
- Place of Execution: DHENKANAL
17
Widening and strengthening of existing SL/IL to two lane carriage way with paved shoulder including geometrics improvement from Km 68/260 to 118/370 of NH – 59 (Erstwhile Km 213/890 to 264/000 of NH- 217) under EPC contract
- Value of Work (in lakhs): 9691.71
- LOA Date/Commencment: 23.10.17
- Place of Execution: BOLANGIR
18
Improvement such as widening & strengthening of Khalikote – Boirani-Aska – Balipadar – Bellaguntha road (SH-30) from 65/733 Km to 83/870 Km (Balipadar to Bellaguntha) under SHDP
- Value of Work (in lakhs): 1925.18
- LOA Date/Commencment: 25.11.17
- Place of Execution: BHANJANAGAR
19
Improvement and widening of Paralakhemundi Town road from 51/623 Km to 56/050 Km of Mandasa-Meliaputi- Paralakhemundi-Kashinagar- Gunupur road Forest Gate to Old Court Chaka in the district of Gajapati under State Plan
- Value of Work (in lakhs): 1403.36
- LOA Date/Commencment: 23.02.18
- Place of Execution: Parlakhemundi
20
Improvement to road from NH-217 (Budhighara JN.) to Ralaba village of Hinjilicut Block in the District of Ganjam under NABARD Assistance RIDF – XXIII
- Value of Work (in lakhs): 1,038.34
- LOA Date/Commencment: 17.03.18
- Place of Execution: GANJAM
21
Improvement to Paralakhemundi – Gumma – Serango road from Km.13/0 to 34/300 Km. for the year 2017-18
- Value of Work (in lakhs): 1,066.85
- LOA Date/Commencment: 14.05.18
- Place of Execution: Parlakhemundi
22
Widening & strengthening of Sinapali-Ghatipada road from 32/000 Km to 47/00 Km under CRF
- Value of Work (in lakhs): 3,106.00
- LOA Date/Commencment: 05.07.18
- Place of Execution: Sinapali
23
Widening & strengthening of Sinapali-Ghatipada road from 0/000 Km to 16/000 Km under CRF
- Value of Work (in lakhs): 3,207.00
- LOA Date/Commencment: 05.07.18
- Place of Execution: Sinapali
24
Improvement such as strengthening to Kendrapara- Basipur road from 0/0 to 6/580 Km under State Plan.
- Value of Work (in lakhs): 586.00
- LOA Date/Commencment: 13.07.18
- Place of Execution: Kendrapada
25
Improvement to road from Malanandapur to Singhpur (ODR) from 0/000 Km to 12/460 Km in the district of Jajpur under State Plan.
- Value of Work (in lakhs): 1,762.21
- LOA Date/Commencment: 05.11.18
- Place of Execution: Jajpur
26
Supply of 50,000 cum. of hard stone machine crushed ballast of 50 mm size at Baghuapal Depot & loading the same into any type of Railway wagon for Khurda Road Division.
- Value of Work (in lakhs): 792.47
- LOA Date/Commencment: 14.11.18
- Place of Execution: Bhaguapal
27
Improvement to Dhama-Jujumara road from 9.000K.M. to 23.600K.M. in the district of Sambalpur under NABARD Assistance(RIDF-XXIV)
- Value of Work (in lakhs): 1,331.15
- LOA Date/Commencment: 16.11.18
- Place of Execution: Sambalpur
28
Improvement to Raikia-Simanbadi road from 0/000 Km to 9/000 Km in the district of Kandhamal under State Plan
- Value of Work (in lakhs): 740.62
- LOA Date/Commencment: 24.01.19
- Place of Execution: Kandhamal
29
Widening and strengthening of existing single lane to intermediate lane carriageway of Bhojpur-Jamankira Road (ODR) from 5/725 Km to 13/420 Km under State Plan
- Value of Work (in lakhs): 889.00
- LOA Date/Commencment: 15.02.19
- Place of Execution: Sambalpur
30
Improvement such as widening & strengthening to Butupalli-Baghiapada road from 0/000 Km to 11/900 Km and 15/000 Km to 18/960 Km in the district of Boudh under State Plan
- Value of Work (in lakhs): 1,377.00
- LOA Date/Commencment: 21.02.19
- Place of Execution: Boudh
31
Widening & Strengthening of Tengadapadar – Chakapad -Nediguda – Badangi road from 14/000Km to 39/560 Km in the District of Kandhamal under CRF
- Value of Work (in lakhs): 3,021.81
- LOA Date/Commencment: 16.10.19
- Place of Execution: KANDHAMAL
32
Excavation of Darpani Branch Canal from RD 25.530 Km to 27.520 Km including its structures of Right Bank Canal of Rengali Right Irrigation Project.
- Value of Work (in lakhs): 1,688.68
- LOA Date/Commencment: 04.05.20
- Place of Execution: Talcher
33
Strengthening to NH-326 From Km 253/700 to Km 281/700 (Laxmipur To Kakriguma) for the year 2019-20 in the state of Odisha on EPC mode
- Value of Work (in lakhs): 1,510.00
- LOA Date/Commencment: 18.05.20
- Place of Execution: Koraput
34
Periodical Renewal from Km. 142/620 to 159/280 Km. of NH-26 for the year 2019-20 in the state of Odisha on EPC mode
- Value of Work (in lakhs): 600.00
- LOA Date/Commencment: 03.06.20
- Place of Execution: Bolangir
35
Periodical Renewal (P/R) to NH 59 from 12/400 to 44/000 Km, 51/200 to 57/000, 57/290 to 68/290 km (actual length 48.69 km) for the year 2019-2020 in the state of Odisha on EPC mode
- Value of Work (in lakhs): 1,050.00
- LOA Date/Commencment: 03.06.20
- Place of Execution: Bolangir
36
Urgent repair and maintenance from Km.0.000 to 60.000 of Panikoili-Rimuli Section of NH -215 (New NH-20) in the State of Odisha
- Value of Work (in lakhs): 1,499.45
- LOA Date/Commencment: 28.09.20
- Place of Execution: Panikoili
37
Urgent repair and maintenance from Km.113.300 to 166.173 of Panikoili-Rimuli Section of NH -215 (New NH-20) in the State of Odisha
- Value of Work (in lakhs): 1,508.57
- LOA Date/Commencment: 28.09.20
- Place of Execution: Panikoili
38
Urgent repair and maintenance of Baliagoda service road from Km.128.500 to 129.500 of Panikoili-Rimuli Section of NH -215 (New NH-20) in the State of Odisha
- Value of Work (in lakhs): 515.00
- LOA Date/Commencment: 05.10.20
- Place of Execution: Panikoili
39
Improvement to Odagaon Bahadajhola Nuagaon road from 27.000km to 43.000km in the District of Nayagarh under NABARD Assistance RIDF-XXV
- Value of Work (in lakhs): 1,286.23
- LOA Date/Commencment: 29.10.20
- Place of Execution: Nayagarh