railway projects
01
Koraput-Singapur Road Doubling Project:- Supplying, transporting and stacking of 97,000 cum of contractor’s hard stone machine crushed Track Ballast as per Railway specifications between Lakshmipur Road – Tikiri stations (including yard) from 61.17 Km to 83.06 Km on KR line of WAT Division of East Coast Railway.
- Value of Work (in lakhs): 1,551.87
- LOA Date/Commencment: 26.12.18
- Place of Execution: Koraput
02
Package- A1 – “Construction of roadbed and Minor Bridge, ETC works in connection with Doubling between Mau (MAU) (Excluding) 0.00 Km and Azamgarh (AMH) (Including) Km 43.50 (Total 43.50 Km) in Varanasi Division of North Eastern Railway, Uttar Pradesh, India”.
- Value of Work (in lakhs): 9,725.24
- LOA Date/Commencment: 09.10.19
- Place of Execution: VANARAS
03
Package – B1 – “Construction of roadbed, Major and Minor Bridge, ETC works in connection with Doubling between Azamgarh (AMH) (Excluding) 43.50 Km and Shahganj (SHG) (Including) 99.75 (Total 56.25 Km) in Varanasi Division of North Eastern Railway, Uttar Pradesh, India”
- Value of Work (in lakhs): 12,340.22
- LOA Date/Commencment: 09.10.19
- Place of Execution: VANARAS
04
Package – 5A -“Construction of Roadbed, Minor Bridges, Service Buildings including amenities, Passenger amenities at stations and related works along with General Electrical works in connection with 3rd Line between Rayagada (Excl) (KM 343.90) – Jimidipeta (Excl) (KM 356.518) on Waltair Division of East Coast Railway in Odisha State, India.
- Value of Work (in lakhs): 5,046.70
- LOA Date/Commencment: 15.10.19
- Place of Execution: RAYAGADA
05
Execution of work of roadbed, minor bridges, track linking, other civil works and general electrical works between RAIPUR – RVH in connection with doubling between Raipur to Titlagarh on Raipur Division of South East Central Railway in Chhattisgarh state, India
- Value of Work (in lakhs): 2,012.75
- LOA Date/Commencment: 25.11.19
- Place of Execution: RAIPUR
06
Execution of balance work of roadbed in section as well as on bridge approaches, construction of minor bridges between Sagadapata (incl.) and Tomka (incl.) in connection with doubling between Jaroli – Jakhapura section on Khurda Road Division of East Cost Railway in the State of Odisha, India.
- Value of Work (in lakhs): 4,998.28
- LOA Date/Commencment: 25.02.20
- Place of Execution: KEONJHAR
07
Packge – 5B – Construction of Roadbed, bridges and general electrification works for 3rd line of track between Gotlam (Incl)(KM459.840) – Vizianagaram ( Inc)(KM 818.65 on HWH-VSKP Main Line) for a length of 6KM and Construction of New Single Line BG track, Bye Pass Line between Gotlam and Nellimarla (8.035km), involving Construction of Roadbed, bridges and general electrification works between Gotlam (Excl) (KM 461.252) – Nellimarla Junction cabin (KM 812/6-8 on HWH-VSKP Main Line) in Waltair Division of East Coast Railway, Andhra Pradesh state, India.
- Value of Work (in lakhs): 7,760.69
- LOA Date/Commencment: 31.08.20
- Place of Execution: Visakhapatnam
08
Execution of Track linking work (excluding supply of Rails and Sleepers and Thick webs switches) from Sagadapata to Tomka station of Jaroli-Jakhapura Doubling Project of Khurdha Road Division of East Coast Railway in the state of Odisha, India.
- Value of Work (in lakhs): 3,856.80
- LOA Date/Commencment: 01.04.21
- Place of Execution: KEONJHAR
09
Koraput-Singapur Road Doubling Project: Execution of Earth-work in formation, Major bridges’ works, Minor bridges’ works, P.Way related works, Supply of Ballast, Station & Service buildings works, Platforms’ works, Foot Over Bridges’ works and other allied works from Km 33.50 to Km 61.17 in Baiguda- Lakshmipur Road section in connection with doubling of existing single line track in Koraput-Singapur Road line of Waltair Division of East Coast Railway.
- Value of Work (in lakhs): 23,815.47
- LOA Date/Commencment: 04.08.21
- Place of Execution: KORAPUT
10
Construction of Roadbed, Earth Work and Track Linking Excluding Supply of Rails and Sleepers, Thick Webs Switches Other Miscellaneous Works in connection with doubling between Jaroli-Jakhapura from Jaroli to Porjanpur Section on Khurda Road Division.
- Value of Work (in lakhs): 9,005.70
- LOA Date/Commencment: 28.12.21
- Place of Execution: KEONJHAR
11
Execution Of Work Of Roadbed, Minor Bridges, Major Bridges, Supply Of Ballast And Track Linking (Excluding Supply Of Rails And Sleepers, Thick Web Switches And Special Sleepers) Between Chainage Km 79.6- Km 93 Of Taroki -Rowghat Section And Track Linking in Rowghat yard in connection with Dallirajhara- Rowghat new Rail line project on Raipur Duvision of south east central railway in Chhattisgarh State , India.(Shivam) Agt: Rs 146,57,21,331/-
- Value of Work (in lakhs): 14,657.21
- LOA Date/Commencment: 07.03.2022
- Place of Execution: Chhattisgarh
12
Execution of Roadbed (earthwork in Cutting & Banking), Laying of Blanket, Minor Bridges, RUB/LHs, Building works, supply of vehicle, site facilities & General Power Supply including power line diversion works and other allied works between km.143 to 172 (29 Route km+12.108 Long chainage=41.1km) and supply of track ballast, track linking works including unforeseen/allied items between km 194 to 143 (51 Route km+LC 12.108km=63km(Apx) of Khurda Road-Bolangir new BG Rail Link project of E.Co.Railway.
- Value of Work (in lakhs): 30,957.00
- LOA Date/Commencment: 04.04.22
- Place of Execution: KHURDA BOLANGIR
13
Provision of 3rd and 4th line between Barabanki (Excluding)-Malhaur (Excluding) Stations (2X13.50 Km) including Electrification & Signalling works on Lucknow Division of Northern Railway.
- Value of Work (in lakhs): 22,370.92
- LOA Date/Commencment: 28.01.2023
- Place of Execution: Lucknow
14
Talcher-Bimalagarh new B.G Rail link project: Execution of Earthwork in formation, minor bridges, drains, protection works, approaches of RUBs, supply of Track ballast, P.way linking and other allied works between Khamar (CSB:Km.48.125-Excluding yard) & Srirampur (CSB:Km.67.425-Including yard) stations.: GVR-SHV JV
- Value of Work (in lakhs): 11,254.39
- LOA Date/Commencment: 15.09.2023
- Place of Execution: TALCHER
15
Execution of balance work of earthwork in formation in embankment/cutting,extension of 2 nos. minor bridge, construction of goomty, PF, PF shelter, FOB,permanent way linking and allied works in Dantan Yard (Phase-2) to Jaleswar(Ex) in connection with the construction of 3rd line between Narayangarh-Bhadrak of S. E. Railway. (SHIVAM BDPL JV)
- Value of Work (in lakhs): 12,513.73
- LOA Date/Commencment: 13/08/2024
- Place of Execution: JALESWAR TO BHADRAL
16
Execution of balance work ofEarthwork in Formation in Embankment/Cutting,Extension of 10nos. Minor Bridge, Construction ofgoomty , PF , PF shelter, Permanent Way Linking andallied works in Jaleswar (EX) to Rajghat (EX) (185.75-190.50) and between Nuagaon Mayurbhanj Road (In)(Km: 206.54) to Rupsa (Ex) (Km: 211.91) in inconnection with the Construction of 3rd Line betweenNarayangarh – Bhadrak of S. E. Railway.(SHIVAM BDPL JV)
- Value of Work (in lakhs): 9,977.63
- LOA Date/Commencment: 28/08/2024
- Place of Execution: Jaleswar (EX) to Rajghat
17
Earthwork in cutting and filling, blanketing,construction of minor bridges, major bridges, RUB, ROB,retaining wall, level crossing, side drain, catch water drain,P.way work and other ancillary works from IR Ch. 205.000 kmto 260.2 Km between Kalipahari (inc.) to Pradhankhuta (exc.) inconnection with construction of multi tracking Railway BG line. ASONSOL DIV: (RVNL-SCPL JV): RS.837,67,19,698.44
- Value of Work (in lakhs): 83,767.20
- Place of Execution: ASONSOL , KOLKATTATO BHADRAL
18
Execution of Earthwork in formation, Minorbridges, Major Bridges, Yards, Station Buildings, ServiceBuildings, P-way linking work, Ballast supply, Platformwork , PF shelter, drain work, camping facilities, protectionworks and other allied works between Mahuldiha(In) (Ch:117.525 km) – Bimalagarh(In) (Ch:149.78 km) including allyards in connection with Talcher – Bimalagarh New BGRail Link Project. ROYAL-SHIVAM (JV). Agt Valu: Rs 411,74,98,183.27
- Value of Work (in lakhs): 41,174.98
- LOA Date/Commencment: 26/11/2024
- Place of Execution: TALCER BIMLAGARH
19
Design, Supply, Erection, Testing andCommissioning of 25kV OHE in New line between Dasapalla(Excl.) to Purunakatak(Excl.) of East CoastRailway. SIPS SCPL JV RS. 37,79,07,209.40/-
- Value of Work (in lakhs): 3,779.07
- LOA Date/Commencment: 04/12/2024
- Place of Execution: DASPALLA